Get 10% off LED Lights, Window Repair, Safety Interlocks, and Conveyor Repair.
Any machine, regardless of its year, make or model, still requires scheduled maintenance services from time to time. An equipment that is routinely checked for preventative maintenance is guaranteed to outlast other equipment that does not undergo similar procedure.
At MTD, we are committed in providing our customers with services that maintains the reliability of our machines. Safeguard your machine’s efficiency and longevity with MTD Preventative Maintenance. Our expert service engineers are factory-trained to keep your machines running right. With direct access to genuine original parts, we can secure your machines back in OEM specifications.
Level 1 • Clean spindle taper • Clean and remove chips from the machine (Customer to supply vacuum, towels, etc., and dispose of waste) • Move covers back, clean, and inspect • Check all axis ways and way wipers • Check ballscrew lubrication • Check operator panel lamps and push button switches • Check and adjust the system hydraulic and pneumatic pressures • Check spindle oil chiller for proper operation (Customer is responsible to have coils and filter cleaned) • Check door interlocks and E-stops • Backup the control to disk • Check way lubrication system for proper operation • Check spindle oil lubrication system for proper operation • Check air and oil mixing valve lines • Check and adjust the counterbalance pressure (if applicable) • Inspect magazine pocket • Clean heat exchanger filters • Check and clean/replace coolant filters Note • Customer must purchase filters separately and in advance of the PM services. • Customer must purchase servo and control batteries separately and in advance of the PM services. Note 1: PM prices do not include travel time or travel related expenses (plane fare, car rental, hotel, airport parking, meal charges, etc.). These charges will be in addition to the hours listed above. Note 2: Cleaning supplies, fluids, repair parts and any shipping charges will be the responsibility of the customer. Note 3: Machines must be fully functional prior to starting PM services. Note 4: If it is determined that repair parts and/or service is needed beyond the scope of the PM services, those parts and services will be quoted and charged separately. Note 5: The particular items checked/addressed during PM services may vary for different machine models/optional equipment. Note 6: Prices are per machine.
Level 2 • Replace hydraulic oil and filters (Customer responsible to supply and dispose of fluids) • Check machine level, geometry, and backlash adjustments • Inspect and adjust gibs on X, Y and Z axes • Zero position adjustment on all axes • Table pad checks • Spindle clamp force check • Check tool changer alignment • Check each magazine pocket • Check magazine for chain tension, tool station condition door switches, etc. (If this needs to be adjusted, request procedure) • Check ways or guide rails for damage • Replace all way wipers (if applicable; Customers should order before service arrival) • Drain, clean, and refill coolant tanks (Customer to empty, clean, and dispose of old coolant and supply new fluids) • Change all machine batteries, control memory, and all drives Additional Services Available • Laser calibration • Ballbar • B-axis calibration (Autocollimator ) • MAML and MAMC PM: Checks roller packs, TLS, racks, turret, robot and belts, all around cleaning. • FMS PM: Checks roller packs and guideways, load stations, buffers, front of MC’s chip reader, vehicle XYZ movement, power rail wear, CAT track inspection, cell cabinet